Sleep Therapy Manufacturing Facility – Philips Respironics
This high-tech production facility focuses on the employee as much as the sophisticated manufacturing and distribution process. A large glass wall in the atrium/lounge area provides a visual connection to the activity in the production areas enhancing the connection between office worker/researcher and the final product.
Pittsburgh, PA
170,000 SF
LEED Gold
The steel-framed office building is clad with light gray metallic panels with a blue corrugated metal feature wall. It houses a training room, laboratory spaces, exercise room, cafeteria, offices, and meeting rooms.
Manufacturing and warehouse functions are housed within a pre-engineered metal building. A sophisticated automated conveyor system brings products from the manufacturing area to a storage mezzanine in the warehouse for automated sorting.